Repairs
Remember when the enormous crack appeared in the guest room ceiling last August? First, we got the foundation fixed.
("Didn't we just do that?"
"Yes, when Ro was in the first grade."
"Oh".")
Then, we had a father-son team come in and replace most of the ceiling and texture it. Next, we finally removed the last backing of wallpaper border from the walls and Bob painted the room and the ceiling. Finally, we moved the furniture back in from the living room, which is when we discovered that the foundation repair had busted a pipe under the house and the seepage had reappeared along the front wall, soaking the new carpet and pad and peeling the veneer off the IKEA bookcases. But no books were damaged- whew!
So, we shoved the bookcases to the other side of the room, turned off all the water to the house and called the plumber, who couldn't really do anything in the black dark and agreed to come back in the morning. The leak was found and repaired and the plumbers recommended a water-damage crew to look at the carpet.
There's now a blower system under and over the carpet, making it undulate up and down and a de-humidifier whose hose runs into the washer drain. They have to operate non-stop for several days to insure that the carpet dries and doesn't mold. It's really kind of interesting. We sympathize with flood damage victims who have it about a million times worse. They check in on it everyday and the technician said that he was sure I could turn it off on Sunday evening for a couple of hours while we have a family dinner. Even needing expensive upkeep, it's still home.
Marge's friend Davy- the one who visited with her in AZ when Morgie was born- will be in town and wants to see where she grew up and meet more of the family. I'm making the most homely thing I can think of: beef-noodle casserole. With salad and broccoli, the family vegetable, and applesauce cake for dessert.
In addition to all the home repairs, I hauled the coffee table onto the back porch and re-finished the top. After twelve years of hard use, it was due. It needs a top coat of polyurethane, because the stain+poly finish product didn't quite get the job done, but it looks very nice. Close enough for government work, anyway. If I give it a quick coat tonight, and another in the morning, it should be dry by Sunday evening.
We have two super groups coming in todayto the Thanksgiving site- two batches of the Young Men's Service League and the women's sorority that was there last Saturday. I'm in charge the whole day, as poor Cathy picked up a box the wrong way and wrecked her back. I no longer pick up anything heavier than a box of 'Helpers'- I figure that's what the guys are for.
In addition to the ongoing packaging of plasticware, we have six big boxes of candy from somewhere- I heard a dentist, but that makes no sense- to bag up for Christmas. It's always good to have that to put in the boxes, even if it's a little Halloween-themed.
Busy week ahead: the theater director at the local high school called and asked me to be the seamstress for "Beauty and the Beast", this year's musical . Everything is rented, but there may be some alterations and they need someone on site to do any repairs during the performances. Actors are harder on costumes than you might imagine. Can't be there all the time- conflicts with Thanksgiving program, but we're working around that.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment